        香河園地鐵建站封閉防塵棚建筑工程

           項  目  介  紹  
         Project introduction

        本工程為地鐵17號線香河園站建站膜結構封閉防塵棚工程,結構形式屬于典型的骨架支承式膜結構。封閉場地輪廓長80米,寬40米,結構總高度為22米。防塵棚四周墻膜封閉到5.2米標高位置,5.2米標高以下用彩鋼板封閉。四周墻下方留通道門洞。屋頂膜分為7個獨立膜單元,四周山墻膜分為20個獨立膜單元,其中最大膜單元的展開面積約515平米。

                       Construction project of closed dustproof shed in Xianghe garden subway station
        The project is a closed membrane dustproof shed for the construction of Xianghe yuan station on subway line 17. The structure is a typical frame supported membrane structure. The enclosed contour is 80 meters long and 40 meters wide, with a total height of 22 meters. The membrane wall of the dustproof shed is started from 5.2 meters high, and the color plate is used below the elevation of 5.2 meters to seal it. There is a tunnel at the bottom of the wall. The membrane roof is divided into 7 independent membrane units, and the surrounding gable walls is divided into 20 independent membrane units. The largest expanded area of the membrane units is about 515 square metres.

        竣工時間:2018年4月                       Completion time:  Apri. 2017
        建設地點:北京                            Construction site:  Beijing
        結構形式:骨架式                          Structure form:  Framework membrane structure
        膜 面 積:6700平米                        Membrane area:  6700 square meters
        膜材型號:MC250P PVDF膜材                 Membrane Material: MC250P PVDF